-
Information on transferring wood processing factory

‘‘Suitable for FACTORY – COMPANY OFFICE – BUSINESS EVERY SECTOR’’
+ Factory in Long Hau Industrial Park, Long An province, 1.5 km from Hiep Phuoc port, 8 km from Phu My Hung.
+ Area of 8,000 m2 of land, plot location on the corner of Center Street.
+ 2-storey factory with floor area of 10,000 m2:
– Ceiling height of each floor is 6m, heat resistant according to Leed standards.
– Floor load 1 ton/m2 on the 1st floor, 500kg/m2 on the 2nd floor.
– Stabilized footing with a depth of 45 m.
+ Solution construction contractor, MEP contractor and SANYO Japanese industrial wastewater filtration system.
+ There is an operator and showroom of 1,200 m2, 5 floors solid foundation, completed infrastructure system.
+ Ancillary house 400 m2 has been operated.
+ The garage floor 600 m2 poured solid concrete.
+ European standard dust extraction system.
+ Beautiful landscape design.
+ The factory is designed to optimize the area and use capacity.
+ Led silver standard infrastructure.
+ Roof solar system available with investment cooperation contract (roof area 8,000 m2 solar battery).
+ Environmental wastewater treatment system according to Sanyo’s design standards.
** Transfer plan, transfer price. There are 2 options:
– Option 1: Selling the factory excluding machinery: 125 billion.
– Option 2: Selling the whole factory, including a full line of machines in the current state of 155 billion.
** Juridical:
– Industrial park land with one-time payment of land rental for 50 years (current price of land in the IP is 240$/m2).
– Obviously, transfer now.
*** Interested investors please contact Hotline 0974488225
Sitemap: Trang chủ, Giới thiệu, Dịch vụ, Giáo dục, Nghỉ dưỡng, Bất động sản, Tin tức, Liên hệ,




















