• Information on transferring wood processing factory

   

‘‘Suitable for FACTORY – COMPANY OFFICE – BUSINESS EVERY SECTOR’’

+ Factory in Long Hau Industrial Park, Long An province, 1.5 km from Hiep Phuoc port, 8 km from Phu My Hung.

+ Area of ​​8,000 m2 of land, plot location on the corner of Center Street.

+ 2-storey factory with floor area of ​​10,000 m2:

– Ceiling height of each floor is 6m, heat resistant according to Leed standards.

– Floor load 1 ton/m2 on the 1st floor, 500kg/m2 on the 2nd floor.

– Stabilized footing with a depth of 45 m.

+ Solution construction contractor, MEP contractor and SANYO Japanese industrial wastewater filtration system.

+ There is an operator and showroom of 1,200 m2, 5 floors solid foundation, completed infrastructure system.

+ Ancillary house 400 m2 has been operated.

+ The garage floor 600 m2 poured solid concrete.

+ European standard dust extraction system.

+ Beautiful landscape design.

+ The factory is designed to optimize the area and use capacity.

+ Led silver standard infrastructure.

+ Roof solar system available with investment cooperation contract (roof area 8,000 m2 solar battery).

+ Environmental wastewater treatment system according to Sanyo’s design standards.

** Transfer plan, transfer price. There are 2 options:

– Option 1: Selling the factory excluding machinery: 125 billion.

– Option 2: Selling the whole factory, including a full line of machines in the current state of 155 billion.

** Juridical:

– Industrial park land with one-time payment of land rental for 50 years (current price of land in the IP is 240$/m2).

– Obviously, transfer now.

*** Interested investors please contact Hotline 0974488225

 

Sitemap: Trang chủGiới thiệuDịch vụGiáo dụcNghỉ dưỡngBất động sảnTin tứcLiên hệ,

 

 

Contact